fully automatic operation system 2.0 for smart metro
tranavi qiji® train autonomous control system (tacs)
urbalis® 888 train control system solution
tranavi® train control system solution
intxis(ctcs2 ato)train control system solution
beidou positioning based train autonomous control system (tacn)
centralized traffic control system (fzk-ctc)
train dispatching command system (tdcs)
railway integrated dispatching system (rids)
computer interlocking system (ilock-ii)
computer interlocking system (ilock)
compute interlocking system (vpi)
full electronic computer interlocking system(ilock-e)
it is said that once you drink from nile, you are destined to return to egypt. for casco, this ancient and mysterious prophecy is coming true. following the successful delivery of phase i and phase ii of the 10th of ramadan railway, casco signed a new order in the egyptian market.
on november 24, the signing ceremony of the elv integration system supply and service procurement project for the southern extension line (phase iii) of the 10th of ramadan railway in egypt was grandly held. qian rong, secretary of the party committee and chairman of avic intl project engineering company (avic intl), and wang yin, secretary of the party committee and chairman of casco signal ltd., signed the contract, witnessed by chen wei, senior deputy general manager of avic intl, tang hui, deputy general manager of china huaxin, chen chunhai, deputy general manager of crsc shanghai engineering bureau group co., ltd., and other leaders.
signing ceremony
at the signing ceremony, qian rong said that casco and its partners performed well in the construction of the phase i and phase ii of the 10th of ramadan railway, which laid a good foundation for the award of this new project, and he hoped that everyone could stick to their the good tradition of solidarity and collaboration and continue to be committed to the construction and delivery of the phase iii project.
on behalf of casco, wang yin expressed his gratitude to avic intl for its trust and cooperating units for their support. he hoped that through the cooperation in phase iii, the partnership between avic intl and casco in overseas markets will be further deepened, and casco will also live up to avic intl’s expectations, play a leading and coordinating role, and make every effort to deliver a high-quality project with the participating units for a win-win result.
as a key project of china’s “belt and road initiative” and the first rail transit line with cbtc signaling system in egypt, the construction of the 10th of ramadan railway in egypt is of great significance to promoting economic and trade cooperation between china and egypt and improving the level of local rail transit technology. phase i and phase ii of the railway were opened in july 2022, and started revenue service in september 2022. so far, the line has been operating safely for more than a year and has won high recognition from the egyptian client.
as the general integrator of the elv system of the phase iii project, casco will assume greater responsibilities, maximize its technical advantages in specialized fields, deepen cooperation with various collaborating units, make persistent efforts to provide a full range of products and services for the smooth implementation of the project, and establish it as a model for economic and trade cooperation between china and egypt.
the nile river and the yangtze river, which gave birth to great civilizations, both flow into the sea at 31°n. today, casco and avic intl signed a contract in shanghai where the yangtze river meets the sea, representing that both parties will form a new team. at the other end of this latitude line, the new journey of the construction of phase iii of the 10th of ramadan railway will also be launched in full swing.
11f, building 2, shibei one center, no. 21, lane 1401, jiangchang road, jing'an district, shanghai
86 -21-5663 7080
041-35775(railway)