fully automatic operation system 2.0 for smart metro
tranavi qiji® train autonomous control system (tacs)
urbalis® 888 train control system solution
tranavi® train control system solution
intxis(ctcs2 ato)train control system solution
beidou positioning based train autonomous control system (tacn)
centralized traffic control system (fzk-ctc)
train dispatching command system (tdcs)
railway integrated dispatching system (rids)
computer interlocking system (ilock-ii)
computer interlocking system (ilock)
compute interlocking system (vpi)
full electronic computer interlocking system(ilock-e)
after the operation of the railway, it connects with golmud-korla, kashgar-hotan and southern xinjiang railways, forming a 2712-kilometer loop line circling the taklamakan desert, and becoming the world's first railway loop in the desert.
read morecasco provided interlocking, train control, monitoring and temporary speed restriction server for the entire line. it is also casco’s first national railway integration project in the true sense which was fully implemented in accordance with the national railway integration standards after casco completed the integration pilot of train control of yunnan-guizhou railway.
read morethe pearl river delta intercity railway includes dongguan-huizhou intercity railway and foshan-zhaoqing intercity railway, of which the former, applied casco’s c2 ato signaling system.
read morebeijing-shanghai high-speed railway is one of the mainlines in the eight vertical and eight horizontal high-speed railway network in the national medium and long-term railway network plan.
read more11f, building 2, shibei one center, no. 21, lane 1401, jiangchang road, jing'an district, shanghai
86 -21-5663 7080
041-35775(railway)